Freedom class littoral combat ship

Planning for a class of small, multipurpose warships to operate in the littoral zone began in the early 2000s. The construction contract was awarded to Lockheed Martin's LCS team (Lockheed Martin, Gibbs & Cox, Marinette Marine, Bollinger Shipyards) in May 2004 for two vessels. These would then be compared to two ships built by Austal USA to determine which design would be taken up by the Navy for a production run of up to 55 ships.

On 15 April 2003, the Lockheed Martin LCS team unveiled their Sea Blade concept based on the hull form of the motor yacht Destriero.

The keel of lead ship USS Freedom laid down in June 2005, by Marinette Marine in Marinette, Wisconsin. She was christened in September 2006, delivered to the Navy in September 2008, and commissioned that November. During INSURV trials, 2,600 discrepancies were discovered, including 21 considered high-priority. Not all of these were rectified before the ship entered service, as moving the ship away from Milwaukee before the winter freeze was considered a higher priority.

Cost overruns during Freedom's construction combined with projected future overruns led the government to issue a "Stop-work" in January 2007 and ultimately led to the cancellation of construction of LCS-3 (the second Lockheed Martin ship) on April 13, 2007. This ship was later re-ordered.

After much inconsistency on how testing and orders were to proceed, in November 2010, the USN asked that Congress approve ten of both the Freedom and Independence classes.

An MH-60 Seahawk helicopter approaching USS Freedom
The ship is a semi-planing steel monohull with an aluminum superstructure. It is 377 feet (115 m) in length, displaces 2,950 metric tons, and can go faster than 45 knots (83 km/h; 52 mph). The design incorporates a large reconfigurable seaframe to allow rapidly interchangeable mission modules, a flight deck with integrated helicopter launch, recovery and handling system and the capability to launch and recover boats (manned and unmanned) from both the stern and side.

The flight deck is 1.5 times the size of that of a standard surface ship, and uses a Trigon traversing system to move helicopters in and out of the hangar. The ship has two ways to launch and recover various mission packages: a stern ramp and a starboard side door near the waterline. The mission module bay has a 3-axis crane for positioning modules or cargo.

The fore deck has a modular weapons zone which can be used for a 57 mm gun turret or missile launcher. A Rolling Airframe Missile launcher is mounted above the hangar for short-range defense against aircraft and cruise missiles, and .50-caliber gun mounts are provided topside.

The core crew will be 40 sailors, usually joined by a mission package crew and an aviation detachment for a total crew of about 75. Automation allows a reduced crew, which greatly reduces operating costs, but workload can still be "grueling". During testing of the class lead, two ship's companies will rotate on four-month assignments.

Four 750-kilowatt Fincantieri Isotta-Fraschini diesel generators provide 3 megawatts of electrical power to power the ship systems.

The Congressional Budget Office estimates that fuel will account for only "8 percent to 18 percent" of the total life-cycle costs for Freedom. Senator Jeff Sessions has called the report into question and has suggested that the Independence, built in his state, would be more fuel efficient and that less frequent refuelings would have an impact on military operations beyond the cost of fuel.


Lockheed Martin has offered an Aegis Combat System equipped variant for National missile defense radar picket use to a number of Gulf states.

The Surface Combat Ship will be offered to Saudi Arabia as part of the 2011 arms deal.

Source: From Wikipedia

Posted by Editor on 1:51 AM. Filed under , , , , , , , , . You can follow any responses to this entry through the RSS 2.0